British ColumbiaBC
- Protect workers in trenches deeper than
- 1.2 m
- Locate notice
- 3 business days
- Statutory holdback
- 10%
- Prompt payment
- Construction Prompt Payment Act passed 2025, not yet in force
CivilConstruction.ca · the field manual for Canadian civil work
What each discipline involves, what the work costs at 2026 tendered prices, the rules in your province, and calculators that work in metric. When you are ready to price a job, send a project brief.
Chapter 01 · Dig
Cut, fill, strip, haul, compact. Every civil job starts as a volume of ground that has to be moved, and every tender prices it by the cubic metre.
Read the discipline guide
Chapter 02 · Lay
Watermain, sanitary and storm sewer, manholes and services, laid in shored trenches to depths set by frost and grade.
Read the discipline guide
Chapter 03 · Pave
Subgrade, granular base, asphalt. Most paving happens in a short season, often at night to keep traffic moving.
Read the discipline guide
Chapter 04 · Span
Piers, girders, decks and culverts: the structures that carry roads over rivers, rail and each other.
Read the discipline guide
Chapter 05 · Bore
Directional drilling, microtunnelling, pipe bursting and bored tunnels: getting pipe under what cannot be dug up.
Read the discipline guideBefore anyone digs, a locator paints the ground. The colours are a national code: white for the proposed excavation, pink for survey, and one colour for each kind of buried service. Tap a colour to find it in the section.
Real averages from public highway tenders, not estimates: Alberta publishes the three lowest bids on every item it tenders. Here are sixteen that set the budget on most civil jobs.
From site servicing on the edge of a city to piling a wharf on the coast: scope, sequence, equipment, the rules that apply and what drives the price.
C-101
Earthworks & excavation
Stripping, bulk excavation, cut and fill, rock, compaction and the volumes that drive every estimate.
C-102
Site servicing & land development
Water, sewer, storm and roads for new lots, and the agreements, levies and sequence that come with them.
C-103
Underground utilities
Watermain, sanitary and storm sewer, manholes and services, from trench design to testing.
C-104
Roadbuilding & paving
How Canadian roads are built layer by layer, and what drives paving, milling and rehabilitation costs.
C-105
Bridges, culverts & structures
Piling, piers, girders, decks, culverts and the rehabilitation work that keeps them in service.
C-106
Hydrovac excavation
Non-destructive digging with water and vacuum: daylighting utilities, winter work and slurry disposal.
C-107
Trenchless & directional drilling
Horizontal directional drilling, auger boring, microtunnelling, pipe bursting and lining.
C-108
Concrete & flatwork
Curb and gutter, sidewalks, pads and structural concrete, and the cold-weather rules that govern them.
C-109
Demolition & site clearing
Structure demolition, hazardous-materials surveys, permits, recycling and clearing a site for new work.
C-110
Marine construction
Wharves, piling from barges, seawalls, riprap and in-water work windows on both coasts and inland waters.
C-111
Rail construction
Track, ballast, sidings, crossings and the access and flagging rules around live railways.
C-112
Aggregates & gravel
Pit run, crushed gravel, base and subbase gradations, supply prices and haul economics.
C-113
Snow & winter works
Frozen-ground excavation, ground thaw, cold-weather concrete, winter roads and snow hauling.
C-114
Municipal infrastructure
How cities specify, tender and renew roads, pipes and ponds, and the standards each one publishes.
C-115
Dewatering
Sumps, well points and deep wells, discharge permits and how long it takes to get an excavation dry.
C-116
Grading, lot grading & retaining walls
Rough and final grading, lot-grading plans and certificates, land clearing and retaining walls.
Statistics Canada rates every class of public infrastructure by remaining service life. “Poor” means less than 40% of its expected life is left; “very poor” means less than 10%.
Statistics Canada, Table 34-10-0288-01, Canada’s Core Public Infrastructure Survey, 2022 reference year (released 2025). The full picture, by asset and owner →
Trench protection depth, locate notice, statutory holdback and the prompt-payment clock. Each is set in provincial law or by the province’s one-call centre, and each links to the source text.
Summaries only; read the regulation before you rely on it. Quebec requires engineer-specified shoring by default; New Brunswick, Newfoundland and Labrador and PEI use 1.2 m. Trench rules in every province →
Thaw closes rural roads to heavy loads in spring, paving plants run hard through summer, and below 5 °C concrete needs a cold-weather plan. Here is the year a prairie contractor plans around.
Manitoba’s restriction window runs from March 1 to June 10 depending on zone; Saskatchewan’s 2026 restrictions began March 20; Alberta’s start once thaw reaches 25 cm.
Hot-mix plants, grading and underground crews run at capacity; locate centres recommend extra lead time from May to September.
CSA A23.1 treats weather as cold when the air may fall below 5 °C within 24 hours of placing.
Hydrovac, ground-thaw units and winter roads keep excavation going through the freeze.
Dates vary by region and year; follow the official road-ban orders. Spring road bans → · Winter construction →
Cut and fill, trenches with sloping or a box, asphalt and aggregate tonnage, concrete, haul-truck cycles. Every one shows its formula and its assumptions.
Project brief
Tell us what you are building, where and when. A person reads every brief and replies by email, usually with questions first.
Start a project brief